How Long Does Swimming Pool Demolition Take?

Pool demolition is the removal of an existing pool from a property. The duration of this process can vary depending on several factors. On average, demolition can take anywhere from one to three weeks.

The pool demolition schedule is affected by the size and type of pool, the materials used in its construction, and the method chosen for its removal. Small above-ground pools generally take less time than larger in-ground pools. In addition, the presence of additional elements such as terraces, fences, or surrounding gardens can also affect the duration of the demolition.

The process itself involves draining the pool, removing water and debris, demolishing the pool structure, and disposing of the materials properly. A pool can be demolished in several ways, such as partial or full removal, each with a different time commitment.

Another factor affecting the schedule is the contractor’s experience and equipment availability. Hiring an experienced and reputable demolition company can speed up the process and ensure it is carried out safely and efficiently.

Considering any local permits or regulations affecting the demolition process is important, as these may increase the overall time. Because every pool demolition is unique, it is best to consult a professional contractor to get the most accurate estimate for the specific project. Given a well-maintained pool and discontinued use, along with essential pool maintenance tips, it becomes important to make a decision.

Methods for Swimming Pool Demolition

There are two primary methods for swimming pool demolition: partial demolition (pool removal) and complete demolition (pool excavation). Let’s explore each method in detail.

Pool Removal

1. Partial Demolition (Pool Removal)

Partial Demolition, also known as Pool Removal, is a method of swimming pool demolition where only a portion of the pool structure is removed, leaving the lower part of the pool intact. This approach is chosen when the pool is in good condition, but the owner no longer wishes to maintain or use it as a swimming pool.

The process of partial demolition begins by draining the pool if it is still holding water. Then, the upper portion of the pool, including the deck and walls, is demolished and removed. The demolished space is typically filled with gravel, sand, or soil, compacted layer by layer. This filling material ensures proper drainage and helps prevent potential settling issues.

Partial Demolition offers several advantages over complete pool removal. It is a cost-effective option, requiring less labor and resources than full demolition. It also preserves the existing pool foundation, reducing the risk of subsidence or soil settling. Moreover, this method is relatively faster, and the filled space can be repurposed for other outdoor projects like gardens, patios, or extensions.

Pool Excavation

2. Complete Demolition (Pool Excavation)

Complete demolition, also known as Pool Excavation, is a comprehensive method of swimming pool removal where the entire pool structure is dismantled and removed from the property. This approach is chosen when the pool is in disrepair, is no longer functional, or the property owner desires to reclaim the space for other purposes.

The process of complete demolition starts with draining the pool and removing all pool equipment and accessories. Then, heavy machinery like excavators or backhoes is used to break down the pool walls and floor, turning the pool into rubble. The debris is loaded onto trucks and hauled away from the site for proper disposal.

Complete demolition offers several benefits, including a clean slate for the property and ample space for new landscaping or construction projects. It eliminates the need for ongoing pool maintenance and reduces potential liabilities associated with pool ownership.

Why You Should Hire a Pool Demolition Contractor

Hiring a pool demolition contractor is essential for a smooth and efficient demolition process. These professionals possess the expertise and specialized equipment required to handle the complexities of pool demolition safely and responsibly. They understand various pool types and can choose the most suitable demolition method, whether it’s traditional excavation, hydraulic breaking, or partial demolition. Pool demolition involves potential hazards like heavy debris and structural instability, making it a risky DIY project. Contractors have experience obtaining necessary permits and adhering to local regulations, ensuring a lawful and compliant demolition. By hiring a pool demolition contractor, you can save time, prevent accidents, and ensure the job is done correctly and with minimal disruption.

Conclusion

Ultimate Construction offers professional swimming pool demolition services, freeing up space for landscaping projects. With over 20 years of experience, they use specialized tools to break down and haul away unwanted pools while disposing of equipment responsibly. They ensure a spotless plot of land by adding new soil layer by layer to prevent sunken spots. Typically completed in 2 to 3 days, weather permitting, they provide tailored demolition plans and free quotes. Besides pool demolition, they excel in various construction work like sod replacement, grading, and landscaping, led by experienced owner David McGill. Trusted and budget-friendly, they offer references upon request. Contact Ultimate Construction to begin your project today.

FAQ

Q: Does removing a pool decrease the home’s value?

Removing a pool can potentially decrease home value, especially if the pool is a valuable selling point. However, it may appeal to buyers seeking a low-maintenance yard. The impact on home value varies depending on location and buyer preferences. You can Replace the pool area with a stunning outdoor living space. Create a lush garden with flower beds, trees, and a cozy seating area. Add a fire pit or water feature for ambiance. Design pathways and lighting to complete the charming retreat.

Q: Is there any approval required when removing the pool?

Yes, in most cases, licenses are required when removing a pool. Local regulations and permits may vary, but it is essential to check with your local authorities and obtain the necessary approvals before starting the pool removal process.

Q: Can the utilization of heavy machinery during pool demolition pose any potential risks or harm?

Yes, heavy machinery used for pool demolition can cause harm if not handled properly. Careless operations can lead to accidents, property damage, and injuries to workers or bystanders. Hiring trained professionals ensures safe and controlled demolition, minimizing risks and ensuring a successful pool removal process.